KOREA SINTO CO., LTD

  • Headquarters / Mechanical
    • Tel. +82-53-615-4901
    • FAX. +82-53-615-4901
  • SHOTBALL
    • Tel. +82-53-615-4901
    • FAX. +82-53-615-2119

COPYRIGHT (C) KOREA SINTO CO,.LTD ALL RIGHTS RESERVED

Problem Solving

IoT·DX

  • Introduction to WIZNEX™
  • Good CastingSystem™
  • ePVS™
  • Equipment Operation Monitor
  • Remote Monitoring System
Visualization of bottle neck process

Improving productivity by monitoring cycle time of each actuator and by specifying delay obtained by analysis between processes.

System Configuration
Visualization of bottle neck process

“Actualization of irregular bottle neck” and “Prediction of malfunction of actuator” are possible
by continued comparison between operation of each actuator (cycle time) and criteria value.

Improvement of productivity
Analysis of bottle neck of production
Implementation of improvement of production line
Improvement of maintenability
Visualization of emergency stop and countermeasure for prevention
Predictive maintenance in accordance with variation of cycle time
Work efficiency and work style reform
Efficiency improvement of data collection and reporting work